Friday, May 3, 2019
Automation System Implementation in manual process of a company Research Paper
Automation System instruction execution in manual process of a company - Research Paper ExampleIt has however stuck to the manual way of piecing together twists. The construction of a make is a typical assembly process. It involves piecing together a number of normal items in coiffe to come up with a customized product. The customized product is a building that is constructed according to the specifications of the owner. It could be a tall skyscraper towering above all the rest in the vicinity a cylindrical expression a dome shaped structure an arc shaped structure or even a basic cardinal roomed house. There be several standard items that lick part of a house. A standard item is maven which is produced in denominations of equal sizes. They are apply everywhere in accordance to the pre set size denominations. Standard items are strategically positioned in order to assemble a complete house. They include doors, window frames, window panes, plumbing pipes, electric wires, taps, sinks, bath tabs, bedeck tiles, nails, bolts, screws, roofing tiles, water garters, building blocks, door latches, door locks, iron sheets among others. These are produced in common sizes that are universally acknowledged. A typical building assembles these standard items in accordance to a well set out design. This makes the construction of a building a typical assembly process. For the sake of this extract, a star building is considered. A single self contained one roomed bedsitter. This bedsitters walls are made of standard building blocks. The roof is made of standard corrugated iron sheets and roofing tiles. It is a building with no storey. It is a square shaped building, 15feet by 15feet. The roof if flat but inclined towards the back of the building. It has one main door and another that leads to the washroom. The washroom is a single rectangular room, 4feet by 8feet. It is complete with a washbowl seat, a shower head and a tap on a sink. The building has two windo ws, one in the front and another small one leading from the washroom behind the house. A 5000liters plastic armored combat vehicle is on the roof. Metallic pipes are used for plumbing. Plastic pipes through the walls create passages for electric wiring. Standard capital boards are below the roof in the house interior. The floor is done with standard square tiles. The building requires several reals to be able to put up. The bill of materials in the next page categorically outlines the material that is required for each portion of the building. The building is divided into eight key portions for proper analysis of the materials required. These portions are the foundation, floor system, wall system, roof system, plumbing system, electric system, finishing and the miscellaneous. Bill of Materials PORTION NAME clobber Foundation Building blocks Ballast, Sand, Cement, water Building rocks Rocks Sand Sand Cement Cement Murram Murram roil Gravel Floor system Sand Sand Cement Cement W all System Building Blocks Ballast, Sand, Cement, Water Sand Sand Cement Cement Twisted Metal Bars Steel Door Frames timber Window Frames Steel Roof System Trusses Wood Cross Members Wood contract Sheet Galvanized Iron Roofing Tiles Ceramics Eaves Wood Gutters Galvanized Iron Plumbing System Sink Vitreous China Shower manoeuver Galvanized Iron Toilet Seat Vitreous China Metal Pipes Galvanized Iron Plastic Pipes PVC lights-out Brass Elbow Joints PVC and Galvanized Iron Electrical System Cables Copper Switches Plastic Sockets Plastic Bulbs scratch and Iron Meter Box Steel, Plastics and Copper Finishing Doors Wood Windows Steel Ceiling Boards
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.